Electricians in Hawke's BayNapier, Hastings and the Bay, after Gabrielle.
Need an electrician in Hawke's Bay? Tell us the job and your postcode, and we'll match you with one licence-checked local sparky who does that kind of work. A power cut or a line down is a different call: Unison runs the lines around Napier and Hastings, Centralines covers Central Hawke's Bay, and Firstlight covers Wairoa.
Three lines companies across the Bay
Unison: Napier, Hastings, Havelock North, Taradale
For a fallen line, call 111 first, then 0800 2 86476. If the power's off, Unison suggests checking your switchboard for tripped switches, then calling Unison before an electrician, because a sparky can't check Unison's network.
Centralines: Waipukurau, Waipawa and the district
24 hour faultline 0800 667 693 (0800 NO POWER). It needs written consent before anyone works within 4 metres of its lines, digs within 5 metres of a pole, cable or box, or trims trees near lines.
Firstlight Network: Wairoa
Faults, 24/7: 0800 206 207. More on Firstlight on our Tairāwhiti Gisborne page.
What Gabrielle did to the power
In Cyclone Gabrielle, floodwater from the Tutaekuri River swamped Transpower's Redclyffe substation, and Unison says losing it cut supply to all 66,000 of its Hawke's Bay customers. Napier's outages ran longest. The damage also put a ripple control plant out of service, so some Napier homes had power back before their hot water.
Centralines had about 5,600 customers affected, and on 15 February 2023 fewer than 850 households were still off, mostly where slips and flooding blocked access.
If water got into the house
Leave anything that was wet switched off, including the switchboard, low power points and the hot water cylinder, until a licensed electrician has checked it. Burn marks, a strange smell or crackling at the board: don't touch it, and ring your lines company.
Earthquake country, and houses from the 1920s and 30s
Unison calls Hawke's Bay one of the most seismically active regions in New Zealand, with 16 earthquakes above magnitude 6.0 since records began in 1840. After 1931, virtually all of Napier's central business area was rebuilt, mostly in Art Deco style, and the Art Deco Trust calls Marewa's 1930s houses Spanish Deco. Most homes on Napier Hill date from the 1920s, and Hastings' streets around Cornwall Park have 1920s villas and stucco houses.
Houses that age can still have original wiring and old fuses. A rewire or a new switchboard is the usual fix, and with original plaster and timber, it pays to pick an electrician who does older homes regularly.
Building in Central Hawke's Bay
Centralines says residential connections in Waipukurau and Waipawa grew more than 2.5% a year on average over five years, and its Waipukurau substation is approaching its limit. For a new connection there, lodge the form at least 30 working days before you want power, and apply before installing solar.
We have local pages for Napier, Hastings and Havelock North. Repair work follows the same national certificate rules here as anywhere, by risk level (certificates explained).
What we'd do in Hawke's Bay
If your house took water in 2023 and nobody has checked the wiring since, start there. For a 1920s or 1930s home, an electrical inspection tells you whether it needs a rewire or just a new board.
Want a specialist to sort it?
Tell us the job and your postcode. We match the licence-checked local electrician who does this kind of work, and they call you. No ring-around, and your number goes to them alone.
Questions
Straight answers.
Can I trim a tree near the line to my house?
Unison doesn't issue tree notices for private service lines, but you can ask it for a safety disconnection before trimming near your own. In Central Hawke's Bay, Centralines needs written consent before anyone trims or fells trees near its lines.
Is Wairoa on Unison?
No. Wairoa is on Firstlight Network, the lines company for Tairāwhiti and Wairoa, so faults there go to 0800 206 207.
Related help
Helpful next
Where this information comes from
- Unison Networks Network coverage, checked 29 October 2026
- Unison Networks Report a problem, checked 29 October 2026
- Unison Networks No power, no hot water, checked 29 October 2026
- Unison Networks Asset Management Plan 2024-34, Section 7: Risk Management, checked 2024
- Unison Networks Power restored to most of urban Napier, checked 21 February 2023
- Unison Networks Safety and trees, checked 29 October 2026
- Centralines Power outages, checked 29 October 2026
- Centralines Safety around electricity, checked 29 October 2026
- Centralines Centralines Crews Working to Restore Power, checked 15 February 2023
- Centralines DS1002 Centralines' Pricing Methodology Disclosure 2024, checked 2024
- Centralines Get power to my property, checked 29 October 2026
- Centralines Connect to solar / distributed generation, checked 29 October 2026
- Firstlight Network Lines Company (home page), checked 29 October 2026
- Firstlight Network Who we are, checked 29 October 2026
- Heritage New Zealand Pouhere Taonga Napier City Centre Historic Area (List No. 7022), checked 28 October 2026
- Art Deco Trust Art Deco Trust Information Sheet 20: Architectural styles seen in Napier and Hawke's Bay, checked 28 October 2026
- Wikipedia Napier Hill, checked 28 October 2026
- Hastings District Council Hastings North Local Area Plan: Supporting Information Report, checked 2025-08
- Electricity Networks Aotearoa (ENA) Is your power out?, checked 28 October 2026
- EWRB Toolbox What paperwork do I need to complete?, checked 28 October 2026
Rules change, so check with the EWRB, WorkSafe or Tenancy Services if something matters to your job. How we write and check these pages.